网上棋牌

Add to favorites
Hello, welcome to Weishu Machinery Technology (Shanghai) Co., Ltd.!
Sort by default
release time
个结果 5 results
Pure water production line

The drinking water filling production line is used to produce bottled aquatic products such as bottled pure water, mineral water, mountain spring water, etc. The product capacity is generally 350ml, 500ml, 1L, etc. The bottle material is PET polyester material, food-grade sanitary material. The liquid filling production line is mainly divided into the following major parts: source water purification equipment, bottle blowing equipment, bottled water filling equipment, coding equipment, labeling equipment, and packaging equipment. According to the actual market demand, the output of the drinking water filling production line provided by our company ranges from 3,000 bottles / hour to 36,000 bottles / hour. The production process of bottled water is running water. The source water is first processed by water treatment equipment to remove impurities, particles, colors, odors, microorganisms, bacteria, viruses and other substances that are not good for human health. In order to meet the standards of drinking water, water treatment is equipped as follows: source pool, booster pump, quartz sand filter, activated carbon filter, ion exchanger, precision filter, RO reverse osmosis (for the production of pure water), hollow fiber filtration (For the production of mineral water, mountain spring water), ozone mixing tower, ozone generator, finished water storage tank, titanium rod filter. In the drinking water filling production line, the bottle blowing system is used to make bottles. Bottled water manufacturers can purchase bottle preforms and bottle caps, and the bottle preforms are once formed in a mold by a blow molding machine and blown into bottles. The three-in-one filling equipment continuously operates with the bottle blowing equipment. The bottle enters the filling machine under the action of wind through the air duct, and the wind is provided by a fan installed at the top of the air duct. The way of filling the drinking water filling production line can be divided into many types: ① the bottle blowing machine and the filling machine are directly connected through the air duct (when the output of the bottle blowing machine follows the speed of the filling machine) ② the automatic bottle unscrambler and The filling machine is directly connected through the air duct (when the output of the bottle blowing machine and the speed of the filling machine do not win, when the output of the filling line is relatively large) ③ Manual loading (for small output), the specific configuration can be determined according to the actual situation . The three-in-one filling machine is used to sequentially rinse, fill, and cap empty bottles. Under the condition that the diameter of the bottle mouth is the same, the filling of multiple capacity bottles can be completed on the same filling equipment, making the product diversification. The semi-finished product after the capping is output by the conveying chain plate, and enters the subsequent process of the drinking water filling production line. It passes through the light inspection equipment, blow dryer, inkjet printer, labeling machine, and packaging machine in order. Date, label, and finally package into 12 bottles / carton, 24 bottles / carton, etc. Of course, when a certain scale of production is achieved, robot palletizers and wrappers can be selected to make the entire bottled water filling line fully automated production. In the drinking water filling production line equipment, the parts in contact with water must be food-grade 304 stainless steel to ensure the production of qualified drinking water. There are also many requirements for the construction of a bottled water plant. It is necessary to change clothes when entering the plant. There must be a laboratory. The finished product water must be sampled and tested every day. The filling machine must be operated in a sterile room to prevent impurities from entering the filling process. The above are just a few of them, and there are many special requirements. We are a professional bottled water production line manufacturer. While providing drinking water filling production line equipment, we can also carry out plant design for customers and follow-up services!

Pure water production line

The drinking water filling production line is used to produce bottled aquatic products such as bottled pure water, mineral water, mountain spring water, etc. The product capacity is generally 350ml, 500ml, 1L, etc. The bottle material is PET polyester material, food-grade sanitary material. The liquid filling production line is mainly divided into the following major parts: source water purification equipment, bottle blowing equipment, bottled water filling equipment, coding equipment, labeling equipment, and packaging equipment. According to the actual market demand, the output of the drinking water filling production line provided by our company ranges from 3,000 bottles / hour to 36,000 bottles / hour. The production process of bottled water is running water. The source water is first processed by water treatment equipment to remove impurities, particles, colors, odors, microorganisms, bacteria, viruses and other substances that are not good for human health. In order to meet the standards of drinking water, water treatment is equipped as follows: source pool, booster pump, quartz sand filter, activated carbon filter, ion exchanger, precision filter, RO reverse osmosis (for the production of pure water), hollow fiber filtration (For the production of mineral water, mountain spring water), ozone mixing tower, ozone generator, finished water storage tank, titanium rod filter. In the drinking water filling production line, the bottle blowing system is used to make bottles. Bottled water manufacturers can purchase bottle preforms and bottle caps, and the bottle preforms are once formed in a mold by a blow molding machine and blown into bottles. The three-in-one filling equipment continuously operates with the bottle blowing equipment. The bottle enters the filling machine under the action of wind through the air duct, and the wind is provided by a fan installed at the top of the air duct. The way of filling the drinking water filling production line can be divided into many types: ① the bottle blowing machine and the filling machine are directly connected through the air duct (when the output of the bottle blowing machine follows the speed of the filling machine) ② the automatic bottle unscrambler and The filling machine is directly connected through the air duct (when the output of the bottle blowing machine and the speed of the filling machine do not win, when the output of the filling line is relatively large) ③ Manual loading (for small output), the specific configuration can be determined according to the actual situation . The three-in-one filling machine is used to sequentially rinse, fill, and cap empty bottles. Under the condition that the diameter of the bottle mouth is the same, the filling of multiple capacity bottles can be completed on the same filling equipment, making the product diversification. The semi-finished product after the capping is output by the conveying chain plate, and enters the subsequent process of the drinking water filling production line. It passes through the light inspection equipment, blow dryer, inkjet printer, labeling machine, and packaging machine in order. Date, label, and finally package into 12 bottles / carton, 24 bottles / carton, etc. Of course, when a certain scale of production is achieved, robot palletizers and wrappers can be selected to make the entire bottled water filling line fully automated production. In the drinking water filling production line equipment, the parts in contact with water must be food-grade 304 stainless steel to ensure the production of qualified drinking water. There are also many requirements for the construction of a bottled water plant. It is necessary to change clothes when entering the plant. There must be a laboratory. The finished product water must be sampled and tested every day. The filling machine must be operated in a sterile room to prevent impurities from entering the filling process. The above are just a few of them, and there are many special requirements. We are a professional bottled water production line manufacturer. While providing drinking water filling production line equipment, we can also carry out plant design for customers and follow-up services!

Pure water production line

The drinking water filling production line is used to produce bottled aquatic products such as bottled pure water, mineral water, mountain spring water, etc. The product capacity is generally 350ml, 500ml, 1L, etc. The bottle material is PET polyester material, food-grade sanitary material. The liquid filling production line is mainly divided into the following major parts: source water purification equipment, bottle blowing equipment, bottled water filling equipment, coding equipment, labeling equipment, and packaging equipment. According to the actual market demand, the output of the drinking water filling production line provided by our company ranges from 3,000 bottles / hour to 36,000 bottles / hour. The production process of bottled water is running water. The source water is first processed by water treatment equipment to remove impurities, particles, colors, odors, microorganisms, bacteria, viruses and other substances that are not good for human health. In order to meet the standards of drinking water, water treatment is equipped as follows: source pool, booster pump, quartz sand filter, activated carbon filter, ion exchanger, precision filter, RO reverse osmosis (for the production of pure water), hollow fiber filtration (For the production of mineral water, mountain spring water), ozone mixing tower, ozone generator, finished water storage tank, titanium rod filter. In the drinking water filling production line, the bottle blowing system is used to make bottles. Bottled water manufacturers can purchase bottle preforms and bottle caps, and the bottle preforms are once formed in a mold by a blow molding machine and blown into bottles. The three-in-one filling equipment continuously operates with the bottle blowing equipment. The bottle enters the filling machine under the action of wind through the air duct, and the wind is provided by a fan installed at the top of the air duct. The way of filling the drinking water filling production line can be divided into many types: ① the bottle blowing machine and the filling machine are directly connected through the air duct (when the output of the bottle blowing machine follows the speed of the filling machine) ② the automatic bottle unscrambler and The filling machine is directly connected through the air duct (when the output of the bottle blowing machine and the speed of the filling machine do not win, when the output of the filling line is relatively large) ③ Manual loading (for small output), the specific configuration can be determined according to the actual situation . The three-in-one filling machine is used to sequentially rinse, fill, and cap empty bottles. Under the condition that the diameter of the bottle mouth is the same, the filling of multiple capacity bottles can be completed on the same filling equipment, making the product diversification. The semi-finished product after the capping is output by the conveying chain plate and enters the subsequent process of the drinking water filling production line. It passes through the light inspection equipment, blow dryer, inkjet printer, labeling machine, and packaging machine in order. The main purpose is to spray the bottle surface with the current production Date, label, and finally package into 12 bottles / carton, 24 bottles / carton, etc. Of course, when a certain scale of production is achieved, robot palletizers and wrappers can be selected to make the entire bottled water filling line fully automated production. In the drinking water filling production line equipment, the parts in contact with water must be food-grade 304 stainless steel to ensure the production of qualified drinking water. There are also many requirements for the construction of a bottled water plant. It is necessary to change clothes when entering the plant. There must be a laboratory. The finished product water must be sampled and tested every day. The filling machine must be operated in a sterile room to prevent impurities from entering the filling process. The above are just a few of them, and there are many special requirements. We are a professional bottled water production line manufacturer. While providing drinking water filling production line equipment, we can also carry out plant design for customers and follow-up services!

Pure water production line

The drinking water filling production line is used to produce bottled aquatic products such as bottled pure water, mineral water, mountain spring water, etc. The product capacity is generally 350ml, 500ml, 1L, etc. The bottle material is PET polyester material, food-grade sanitary material. The liquid filling production line is mainly divided into the following major parts: source water purification equipment, bottle blowing equipment, bottled water filling equipment, coding equipment, labeling equipment, and packaging equipment. According to the actual market demand, the output of the drinking water filling production line provided by our company ranges from 3,000 bottles / hour to 36,000 bottles / hour. The production process of bottled water is running water. The source water is first processed by water treatment equipment to remove impurities, particles, colors, odors, microorganisms, bacteria, viruses and other substances that are not good for human health. In order to meet the standards of drinking water, water treatment is equipped as follows: source pool, booster pump, quartz sand filter, activated carbon filter, ion exchanger, precision filter, RO reverse osmosis (for the production of pure water), hollow fiber filtration (For the production of mineral water, mountain spring water), ozone mixing tower, ozone generator, finished water storage tank, titanium rod filter. In the drinking water filling production line, the bottle blowing system is used to make bottles. Bottled water manufacturers can purchase bottle preforms and bottle caps, and the bottle preforms are once formed in a mold by a blow molding machine and blown into bottles. The three-in-one filling equipment continuously operates with the bottle blowing equipment. The bottle enters the filling machine under the action of wind through the air duct, and the wind is provided by a fan installed at the top of the air duct. The way of filling the drinking water filling production line can be divided into many types: ① the bottle blowing machine and the filling machine are directly connected through the air duct (when the output of the bottle blowing machine follows the speed of the filling machine) ② the automatic bottle unscrambler and The filling machine is directly connected through the air duct (when the output of the bottle blowing machine and the speed of the filling machine do not win, when the output of the filling line is relatively large) ③ Manual loading (for small output), the specific configuration can be determined according to the actual situation . The three-in-one filling machine is used to sequentially rinse, fill, and cap empty bottles. Under the condition that the diameter of the bottle mouth is the same, the filling of multiple capacity bottles can be completed on the same filling equipment, making the product diversification. The semi-finished product after the capping is output by the conveying chain plate and enters the subsequent process of the drinking water filling production line. It passes through the light inspection equipment, blow dryer, inkjet printer, labeling machine, and packaging machine in order. The main purpose is to spray the bottle surface with the current production. Date, label, and finally package into 12 bottles / carton, 24 bottles / carton, etc. Of course, when a certain scale of production is achieved, robot palletizers and wrappers can be selected to make the entire bottled water filling line fully automated production. In the drinking water filling production line equipment, the parts in contact with water must be food-grade 304 stainless steel to ensure the production of qualified drinking water. There are also many requirements for the construction of a bottled water plant. It is necessary to change clothes when entering the plant. There must be a laboratory. The finished product water must be sampled and tested every day. The filling machine must be operated in a sterile room to prevent impurities from entering the filling process. The above are just a few of them, and there are many special requirements. We are a professional bottled water production line manufacturer. While providing drinking water filling production line equipment, we can also carry out plant design for customers and follow-up services!

Pure water production line

The drinking water filling production line is used to produce bottled aquatic products such as bottled pure water, mineral water, mountain spring water, etc. The product capacity is generally 350ml, 500ml, 1L, etc. The bottle material is PET polyester material, food-grade sanitary material. The liquid filling production line is mainly divided into the following major parts: source water purification equipment, bottle blowing equipment, bottled water filling equipment, coding equipment, labeling equipment, and packaging equipment. According to the actual market demand, the output of the drinking water filling production line provided by our company ranges from 3,000 bottles / hour to 36,000 bottles / hour. The production process of bottled water is running water. The source water is first processed by water treatment equipment to remove impurities, particles, colors, odors, microorganisms, bacteria, viruses and other substances that are not good for human health. In order to meet the standards of drinking water, water treatment is equipped as follows: source pool, booster pump, quartz sand filter, activated carbon filter, ion exchanger, precision filter, RO reverse osmosis (for the production of pure water), hollow fiber filtration (For the production of mineral water, mountain spring water), ozone mixing tower, ozone generator, finished water storage tank, titanium rod filter. In the drinking water filling production line, the bottle blowing system is used to make bottles. Bottled water manufacturers can purchase bottle preforms and bottle caps, and the bottle preforms are once formed in a mold by a blow molding machine and blown into bottles. The three-in-one filling equipment continuously operates with the bottle blowing equipment. The bottle enters the filling machine under the action of wind through the air duct, and the wind is provided by a fan installed at the top of the air duct. The way of filling the drinking water filling production line can be divided into many types: ① the bottle blowing machine and the filling machine are directly connected through the air duct (when the output of the bottle blowing machine follows the speed of the filling machine) ② the automatic bottle unscrambler and The filling machine is directly connected through the air duct (when the output of the bottle blowing machine and the speed of the filling machine do not win, when the output of the filling line is relatively large) ③ Manual loading (for small output), the specific configuration can be determined according to the actual situation . The three-in-one filling machine is used to sequentially rinse, fill, and cap empty bottles. Under the condition that the diameter of the bottle mouth is the same, the filling of multiple capacity bottles can be completed on the same filling equipment, making the product diversification. The semi-finished product after the capping is output by the conveying chain plate, and enters the subsequent process of the drinking water filling production line. It passes through the light inspection equipment, blow dryer, inkjet printer, labeling machine, and packaging machine in order. Date, label, and finally package into 12 bottles / carton, 24 bottles / carton, etc. Of course, when a certain scale of production is achieved, robot palletizers and wrappers can be selected to make the entire bottled water filling line fully automated production. In the drinking water filling production line equipment, the parts in contact with water must be food-grade 304 stainless steel to ensure the production of qualified drinking water. There are also many requirements for the construction of a bottled water plant. It is necessary to change clothes when entering the plant. There must be a laboratory. The finished product water must be sampled and tested every day. The filling machine must be operated in a sterile room to prevent impurities from entering the filling process. The above are just a few of them, and there are many special requirements. We are a professional bottled water production line manufacturer. While providing drinking water filling production line equipment, we can also carry out plant design for customers and follow-up services!

  • QQ Consulting
  • QQ QQ
  • QQ QQ
  • Telephone consultation
  • 17321252705
  • 15079107852
  • 15800450161
  • 021-58447276
  • 021-58420116